Service Areas

Retail Box Conversion and Site Work at the Mesilla Valley Mall Area

Converting part of a 602,150 square foot indoor center to light industrial use is a different job from building a warehouse, and we treat it that way. Mesilla Valley Mall opened July 29, 1981, on 77.4 acres with 4,500 parking spaces. A property of that size and age offers floor area and parking that new construction rarely matches, but it brings structural, mechanical and fire code questions that must be answered before a lease is signed.

The center lists 85 stores and five major tenants, so its floor area is carved into very different spaces, from small in-line shops to large boxes. For a fulfillment, storage or light assembly user, the large boxes are the interesting ones, because they have open floors, tall ceilings relative to a small shop and a service corridor behind them. For smaller users, a combination of adjacent suites can form the needed area.

A single owner and manager controls the property, which simplifies negotiations because one party decides on access, work hours and alterations. We approach it as an existing-building project: study first, then modify. Our industrial renovations and modernization team starts with a survey of structure, roof, floor and utilities, and then recommends a scope.

What a retail box can become

The best conversions are fulfillment rooms, parts storage, light assembly, training and service centers, and showrooms with back-of-house storage. They work because the box offers area, parking and a loading position on the service side. They fail when the use needs more clear height than the box provides, or heavier floor loads than the slab was designed for. Owners with larger needs sometimes look at a warehouse building instead, and we are happy to compare a conversion with new construction on the same budget.

For operators in ecommerce fulfillment, our logistics and fulfillment center work shows the dock count and racking assumptions that a conversion needs to meet.

Demolition, slab and dock work inside an existing shell

Conversion starts with selective demolition: removing storefronts, interior walls, ceilings and fixtures while protecting the structure and the rest of the property. We sequence it so that the center keeps operating and customers can reach their stores. Dust control, noise limits and clear routes for pedestrians are part of the plan.

Where a user needs a dock, we cut an opening in the back wall, build a concrete apron and a dock leveler pit, and tie the new work to the existing structure. Where the floor needs to be stronger or flatter, the slab replacement and demolition trade partners remove a section and place a new slab with the thickness and flatness the racking or equipment needs.

A 1981-era building meets today's code

A building from 1981 has the systems and details of its time. Roof structure, fire separation, sprinkler coverage, exits and accessibility may not match current expectations, and a change of use can trigger upgrades. We check the original drawings if they exist, survey the building, and prepare a list of required upgrades before the lease is final.

The state code package includes the 2021 New Mexico Existing Building Code (14.7.7 NMAC). The state code page also lists the 2024 New Mexico Plumbing Code and Mechanical Code as effective August 1, 2026, with permits issued under either the 2021 or 2024 edition until January 1, 2027 and only under the 2024 edition after that. We use that window when it helps the schedule and design to the later edition when it does not. Roof loads and rooftop equipment deserve their own look, since a new refrigeration unit, dock fans or a heavy air handler can add weight the original structure never expected.

Working next to open stores

A conversion done inside an operating center puts construction next to shoppers. We separate the work area with solid barriers, control access, schedule noisy and dusty work for off-hours, and keep delivery vehicles off the customer routes. Contractors and subcontractors check in at one point, and we hold a short coordination meeting with the property manager before any phase begins. Fire exits and sprinkler coverage must remain in service, so any interruption is planned and approved in advance.

We also keep the parking field in mind. With 4,500 spaces, there is room for a staging area, but it must not block fire lanes or customer access. We lay out a construction zone that is fenced and lit, with a dedicated entrance for trucks, and we restore the pavement when we leave.

Paving, lighting and the lot around the building

A large parking field is an asset, and it needs maintenance. Stabilized parking lots covers the resurfacing, striping and drainage work that restores a worn field, and truck-rated sections can be added behind a converted box. We re-grade low spots, repair failed pavement and add lighting where the new use extends the hours of operation.

The surrounding area has other users, from retail to services to light industrial, so a conversion should consider the neighbors. We coordinate with the owner and adjacent tenants on truck routes and delivery hours. For operators interested in newer industrial space, we also build in Arrowhead Park and at the I-10 and I-25 interchange, and we can compare the options.

Survey the box before you sign

Send us the suite number or the building, the use you have in mind and the equipment you plan to install. We will survey the space, list the upgrades and return a budget range before you commit to a lease.

Common Questions

Can a retail box handle pallet racking?

Sometimes. The answer depends on the clear height, the slab thickness and the column spacing. We survey the building, check the slab, and tell you what rack height and load it can support. If it cannot, we price a slab replacement or a lower rack system.

Do I need a new loading dock?

If you receive or ship trucks, yes. Most retail boxes have a service door and a small receiving area, not a dock. We can cut in a dock, with a leveler and an apron, or we can build a ramp for lighter operations. The right choice depends on your trucks.

What upgrades should I expect in a change of use?

Usually fire protection, exits, accessibility, electrical capacity and sometimes the roof. We prepare a list from the survey and the code review before you sign, so the cost is known. The state's existing building code governs how much of the building has to be upgraded.

Can you work while the center is open?

Yes. We build barriers, control dust and noise, and schedule the loud work for off-hours. The property owner has to approve the plan, and we prepare the paperwork they need to see.

Is conversion cheaper than new construction?

Often, for lighter uses, because the shell exists. For heavy racking or tall clear heights, new construction can be cheaper in the long run. We price both so you can compare real numbers.

Related

Ready to talk about your project?

Call575-228-1477