Our Company

About Industrial Contractors of Las Cruces

Freight has a route. It starts in a field, a plant or a packing shed, moves by truck to the port of entry, switches to rail or the interstate and ends at a dock. Industrial Contractors of Las Cruces builds the places along that route: the yards, docks, warehouses, processing buildings, hangars and utilities in Las Cruces, Dona Ana County and the southern New Mexico border region.

We describe our work the way a dispatcher would, in steps and in the order they happen. That keeps the conversation practical, and it keeps your project tied to the freight, product or aircraft it exists to serve.

Step one: the port of entry and the rail park

Santa Teresa is the center of border logistics in this part of the state. It is home to the Santa Teresa Port of Entry and the 1,100 acre Santa Teresa Gateway Rail Park, which is served by the Santa Teresa Southern Railroad and interchanges with the Union Pacific system. A state presentation lists the Union Pacific intermodal terminal there at 74,000 feet of trackage, expandable to 145,000 feet, with 1,266 container and trailer parking stalls. The same document says the Santa Teresa cattle crossing is the largest on the U.S.-Mexico border.

That mix of cattle, containers, trailers and rail cars decides how a building is laid out. We build in the Santa Teresa industrial area with the crossing's timing in mind: inspection holds, queue lengths at the gate, bonded storage and the hours when trucks arrive. A warehouse that ignores those facts will look fine on a plan and jam on a Monday morning.

Where a customer needs to load or unload cars, our rail spur site improvements cover grading, ballast and subgrade preparation, track-adjacent drainage, crossings, and the pads and aprons beside the track. We coordinate with the railroad on its schedule, its inspection steps and its insurance requirements, because those items control the calendar.

Step two: the yard comes before the building

On a border logistics site, most of the money and most of the problems are outside the walls. A cross-dock with forty doors fails if the yard has six places to stage trailers. We design the yard first, starting from the truck: turning radius, trailer count, queue length at the gate and how the pavement behaves under a loaded axle in desert heat.

Our truck courts and trailer yards use heavy-duty concrete in the turning and dock zones, because asphalt can rut under parked trailer landing gear in summer heat. Joint layout, dowels, subgrade stabilization and drainage are specified for the traffic that will actually use the pavement. Sloped, drained yards matter even in a dry climate, since a summer storm can put a lot of water on a flat site in a short time.

Once the yard works, the building is easier. We deliver distribution centers with dock counts, clear heights, column grids and fire protection set for the product, plus the electrical capacity to add racking automation or battery charging later. Tilt-up or pre-engineered framing is a cost and schedule decision, and we price both when the choice is open.

Step three: packing sheds, processing and cold storage

South of town the Mesilla Valley is farm country. NM 28 runs roughly parallel to the Rio Grande through La Union, Anthony and Vado, and Hatch to the north is known for raising chiles. Irrigation draws on wells and on ditches fed from the Rio Grande and the reservoirs upstream. The buildings this agriculture needs are packing sheds, wash and sort lines, dry storage, coolers and small processing plants.

We build food and beverage processing buildings with washdown floors, sloped drains, sanitary wall and ceiling finishes, controlled receiving and wastewater provisions that a regulator will accept. Fresh produce adds a cold chain, and our cold storage construction includes insulated panel envelopes, vapor barriers, under-slab heating where the freezer requires it, refrigerated docks and the structural support for heavy condensing equipment.

Food and beverage owners also work with us on the less visible items: truck wash-out areas, employee parking, process water routing, and how a seasonal crew moves safely between a shed and a field. The food and beverage sector runs on a harvest calendar, so we schedule construction to finish before the season opens, not after.

Aerospace, the airport and the federal footprint

Las Cruces International Airport sits nine miles west of the central business district and has three runways, the longest at 7,506 feet. A 2021 report says the airport's master plan update adds aerospace as a new focus, with utilities, lighting and taxiways extended on the east side to support hangar development. It sits beside the City of Las Cruces Innovation and Industrial Park, which lies at the junction of I-10 and I-25, offers more than 400 acres ready for development and is covered by Foreign Trade Zone 197.

Federal activity at White Sands Test Facility and White Sands Missile Range supports a local supply chain for precision machining, test equipment, secure storage and engineering offices. We build for those firms: shops with clean power and controlled access, hangar space for aircraft and test articles, and offices that tie into production areas. The Las Cruces airport and industrial park is a place where those uses meet, and we plan utility extensions, taxiway-adjacent grading and paving around Federal Aviation Administration height and clearance limits.

The same ground draws large-load users. A 1,400 acre data center is reported under construction in Santa Teresa, and projects of that size shift demand for power, water, labor and concrete across the whole county. We look at those pressures when we plan long-lead procurement and trade scheduling.

Heat, flat ground and water

Las Cruces sits at about 3,908 feet above sea level, with the Rio Grande passing west of the city through the Mesilla Valley. The conditions that shape construction here are heat, wind, flat ground and short, hard rains. Deming, a county seat to the west, notes that minor flooding sometimes covers large areas of flat ground, and the same logic applies across the valley floor.

For concrete, that means pour windows in the early morning or at night, retarders and evaporation control, shaded curing and a standing rule that no slab is placed when the surface temperature will cause plastic cracking. For earthwork, it means grading plans that move water away from buildings and toward a detention area even when the site looks level. For crews, it means water, shade and rest breaks planned into the schedule from day one.

New Mexico enforces the 2021 New Mexico Commercial Building Code, which adopts the 2021 International Building Code as amended. We check that against local zoning, fire and utility requirements for each city or county before we price. Our reach runs from Las Cruces to Anthony, Sunland Park, Mesilla and Hatch, and west to Deming and Luna County, where I-10 and the rail line carry cross-country freight.

How a job runs, in order

  1. Intake. You tell us the use, the site and the date you need to be operating. We confirm access, utilities and zoning.
  2. Budget. We price the yard, the utilities and the building together, with allowances stated and unknowns listed.
  3. Permit and procurement. We submit plans, track comments and order long-lead items such as switchgear, dock equipment and refrigeration early.
  4. Build. A named superintendent runs daily logs, safety checks and a three-week look-ahead that you can read.
  5. Closeout. We test, commission, document and walk the facility with your operators, then close the punch list on an agreed date.

We run this sequence for owner-operators, developers, brokers and tenants who need a building ready for a specific shipment, a harvest or a lease start. Send us the address and the use, and we will answer in the same plain terms.

Common Questions

Do you work near the border crossing at Santa Teresa?

Yes. We build warehouses, cross-dock terminals, truck courts and rail-adjacent improvements in Santa Teresa and the surrounding industrial area. We plan each site around the crossing's inspection steps, queue lengths and delivery hours.

Can you build agricultural packing and processing facilities?

Yes. We construct packing sheds, wash and sort buildings, dry storage, coolers and small processing plants in the Mesilla Valley and nearby farm communities, with sanitary finishes, washdown floors and drainage designed for the product and the regulator.

How do you handle summer heat on concrete work?

We schedule pours for early morning or night, control evaporation and curing, and reject placements when the surface temperature would risk plastic cracking. Crews get water, shade and scheduled breaks as a standing part of the plan.

Do you build hangars and aerospace support space?

Yes. We deliver hangars, secure shops and engineering offices near the Las Cruces airport and elsewhere in Dona Ana County, coordinating utilities, taxiway-adjacent grading and height limits with the airport and its tenants.